Process Overview
This deployment was implemented at Yuhan-Kimberly’s Chungju Plant, delivering an integrated solution that combines a Yaskawa industrial robot with a strapping-cut workbench to automate depalletizing + strap cutting.
The customer pursued a depalletizing system to reduce labor costs and operator fatigue, and showed strong interest in automating strap cutting and strap discharge to further maximize cost savings and operational efficiency.
The solution handles mixed carton sizes by aligning (squaring) cartons, cutting and removing straps, and then feeding cartons into the case packer. This improves throughput and consistency in both carton infeed and strap removal, while reducing physical strain on operators and enhancing workplace safety.
Project Background and Objectives
At Yuhan-Kimberly’s Chungju Plant, cartons arriving on pallets were previously broken down manually and then loaded one-by-one into the case packer. The work was highly repetitive, and manual strap removal using knives created a persistent risk of safety incidents.
The objective of this project was to minimize reliance on manual labor by automating the entire process—from depalletizing through case packer infeed—and to achieve lights-out (unmanned) operation for strap cutting. This enables improved operator safety, reduced fatigue and staffing burden on the floor, and more stable, repeatable plant operations.
Components
| Robot | Yaskawa GP50 Industrial Robot: A high-speed, high-precision 6-axis articulated robot optimized for palletizing/depalletizing operations. It can automatically pick, place, and transfer a wide range of products, making it well-suited for industrial automation. |
|---|---|
| Peripherals | Carton Aligner + Strap-Cutting Station: A workbench system that squares/aligns cartons of various sizes, then cuts and evacuates strapping. Safety Light Curtain + Perimeter Fence: Visually separates the operator zone from the robot cell. If an operator enters the depalletizing area, the system immediately stops motion to ensure safety. |
Workflow
| STEP 1. | An operator loads a pallet of stacked cartons into the designated loading position |
|---|---|
| STEP 2. | The operator selects the carton “recipe” on the HMI (OP panel) and starts the cycle |
| STEP 3. | The robot depalletizes bundled cartons per the selected recipe and transfers them to the alignment/strap-cutting station |
| STEP 4. | The station squares the bundle using servo drives and pneumatic cylinders |
| STEP 5. | The system cuts the straps while the cartons are securely clamped in position |
| STEP 6. | A hook mechanism captures and discharges the cut straps |
| STEP 7. | The station re-squares the bundle to prevent misalignment during cutting |
| STEP 8. | The robot feeds individual cartons to the case packer infeed one by one. |
※ The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.
Recommended Use Cases
Yuhan-Kimberly's Choice! Fully Automated Depalletizing and String Cutting 📦
Process Overview This implementation case, implemented at Yuhan-Kimberly's Chungju factory , combines a Yaskawa industrial robot with a string cutting workstation to achieve automated depalletizing and string cutting. The client introduced the depalletizing system to reduce labor costs and work fatigue, and expressed strong interest in automating rope cutting and discharge to maximize cost savings and efficiency. This solution sorts and cuts boxes of various sizes before feeding them to the case packer, improving the efficiency of the box feeding and rope cutting processes, while also reducing the physical burden on workers and ensuring safety. Project Background and Objectives At Yuhan-Kimberly's Chungju factory , the process of dismantling palletized boxes and loading them into case packers individually was entirely manual. This process was highly repetitive and presented a constant risk of safety accidents due to the use of knives during the removal of the twine. The goal of this project was to automate the entire process, from depalletizing to loading into the case packer, minimizing human dependence. Furthermore, by unmanning the twine cutting process, we aimed to ensure worker safety, reduce fatigue and on-site personnel burden, and ensure stable plant operations.
We successfully automated raw-material transport with OMRON AMRs! 👍
Process Overview This case study features a large, cylindrical raw-material transport solution using OMRON AMRs. Previously, raw-material transport was handled manually, with operators physically rolling large cylindrical containers to move them. Due to operator fatigue and low handling efficiency in this workflow, an automation solution became necessary. In this project, OMRON AMRs were introduced to automate raw-material transport, with the goal of reducing operator burden and significantly improving material-handling efficiency. Project Background and Objectives When raw materials arrived inbound in large containers, the manual transport process required high physical effort and carried a risk of injury. In addition, time loss and workload imbalance led to reduced productivity. The objective of this project is to address these issues by deploying an AMR-based automation solution and realizing more efficient internal logistics operations.
MJ_TEST_260428
Process Overview
This deployment was implemented at Yuhan-Kimberly’s Chungju Plant, delivering an integrated solution that combines a Yaskawa industrial robot with a strapping-cut workbench to automate depalletizing + strap cutting.
The customer pursued a depalletizing system to reduce labor costs and operator fatigue, and showed strong interest in automating strap cutting and strap discharge to further maximize cost savings and operational efficiency.
The solution handles mixed carton sizes by aligning (squaring) cartons, cutting and removing straps, and then feeding cartons into the case packer. This improves throughput and consistency in both carton infeed and strap removal, while reducing physical strain on operators and enhancing workplace safety.
Project Background and Objectives
At Yuhan-Kimberly’s Chungju Plant, cartons arriving on pallets were previously broken down manually and then loaded one-by-one into the case packer. The work was highly repetitive, and manual strap removal using knives created a persistent risk of safety incidents.
The objective of this project was to minimize reliance on manual labor by automating the entire process—from depalletizing through case packer infeed—and to achieve lights-out (unmanned) operation for strap cutting. This enables improved operator safety, reduced fatigue and staffing burden on the floor, and more stable, repeatable plant operations.
Components
| Robot | Yaskawa GP50 Industrial Robot: A high-speed, high-precision 6-axis articulated robot optimized for palletizing/depalletizing operations. It can automatically pick, place, and transfer a wide range of products, making it well-suited for industrial automation. |
|---|---|
| Peripherals | Carton Aligner + Strap-Cutting Station: A workbench system that squares/aligns cartons of various sizes, then cuts and evacuates strapping. Safety Light Curtain + Perimeter Fence: Visually separates the operator zone from the robot cell. If an operator enters the depalletizing area, the system immediately stops motion to ensure safety. |
Workflow
| STEP 1. | An operator loads a pallet of stacked cartons into the designated loading position |
|---|---|
| STEP 2. | The operator selects the carton “recipe” on the HMI (OP panel) and starts the cycle |
| STEP 3. | The robot depalletizes bundled cartons per the selected recipe and transfers them to the alignment/strap-cutting station |
| STEP 4. | The station squares the bundle using servo drives and pneumatic cylinders |
| STEP 5. | The system cuts the straps while the cartons are securely clamped in position |
| STEP 6. | A hook mechanism captures and discharges the cut straps |
| STEP 7. | The station re-squares the bundle to prevent misalignment during cutting |
| STEP 8. | The robot feeds individual cartons to the case packer infeed one by one. |
※ The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.