Process layout
Process Overview
This case study demonstrates an inline logistics solution that utilizes the Yujin Robot GoCart180 and an upper conveyor module to automatically transport plastic injection products from the injection molding machine to the shipping facility.
By developing a conveyor module tailored to the customer's production line, we automated product loading and unloading, achieving complete automation throughout the entire inline transport process without operator intervention.
Warranty Period
- 1 Year
Performance Year
- 2023
Project Duration
- Need for consultation
Project Background and Objectives
- Injection molding manufacturing in-line labor shortage
- Factory operations are disrupted due to difficulties securing workers
- Workers avoid work due to the risk of musculoskeletal disorders and industrial accidents
Components
| Robot | Two Yujin Robot GoCart180 ; Payload: 180kg ; ISO 13482 PLd safety standard certified ; Operating speed: up to 1.0m/s |
|---|---|
| Peripherals | Upper electric conveyor module ; Order picking cart ; Middleware |
Workflow
| STEP 1. | After the injection molding machine injects the food container, it is discharged onto the conveyor |
|---|---|
| STEP 2. | When the injection product reaches a certain amount, the AMR is automatically called |
| STEP 3. | The injection product is automatically loaded from the injection molding machine conveyor to the upper conveyor of the AMR |
| STEP 4. | The AMR moves the injection product to the shipping space |
| STEP 5. | The injection product is automatically unloaded from the AMR conveyor to the shipping conveyor |
| STEP 6. | The worker packages and ships the product. |
Key Features
- Fully automated inline logistics using electric conveyor modules
- ISO 13482 PLd certification, safe AMR movement utilizing seven sensors
- Preventing industrial accidents through automated transport of high-temperature plastic injection molded parts
- Consulting to optimize robot operation based on operational data after solution implementation
Implementation Results
| Key Metrics | The introduction of robots has reduced the amount of simple transportation work, and the number of simple walking routes for workers during work hours has been reduced by 90%. Robots have replaced these tasks, reducing labor costs by 33%. |
|---|---|
| Client Feedback | By replacing the 25-meter-long transport task, which required a single worker to walk every five minutes, with AMRs, worker satisfaction has increased and they can now focus on higher-value tasks. By completely separating the hazardous injection molding machine workspace from the worker's workspace, we have eliminated safety risks such as noise and crushing. Furthermore, by establishing the image of a state-of-the-art factory utilizing AMRs during customer visits, we have positively impacted customer orders. |

Unauthorized copying or reproduction of any content on Marosol may violate the Unfair Competition Prevention Act and Copyright Act.
Recommended Solution
An order picking system solution for logistics warehouses utilizing AMRs
This case study demonstrates an order picking system that optimizes the operation of ten Eugene Gocart 180s using Marosol's remote control system, SOLlink.
A house built by robots?! Space Workshop automates everything from modular housing window Assembly! π οΈπ
This implementation case is the first solution in Korea to achieve residential window Assembly automation by combining KUKA industrial robots with a self-designed robot gripper and High Payload Track Motion. Space Workshop introduced the window Assembly automation system with the goal of reducing construction costs and producing modular homes of consistent quality.
Heavy logistics automation success! Omron AMR automatically returns lead tabs π¦π€
Process Overview This case study demonstrates the automation of heavy-duty product transport using Omron AMR logistics robots . The client implemented a logistics automation system to reduce inefficiencies and labor burdens associated with repetitive, heavy logistics tasks. Specifically, they sought to reduce costs and maximize logistics efficiency through automated palletizing and return operations. This solution automates simple, repetitive tasks like product movement and loading, thereby increasing the efficiency and accuracy of the shipping process and reducing worker burden, thereby enhancing safety and productivity. Project Background and Objectives The client recognized the need for automation in heavy cart transport and lead tab return operations and sought to improve logistics operational efficiency and reduce operating costs by introducing AMRs. This project aimed to: Automating lead tab return and cart transport Improving worker productivity and ensuring safety Enhancing efficiency and flexibility in the logistics field










